Technical guide
LUMNEX / SINGAPORE / INDOOR
Why testing and calibration matter.
A finished LED wall should be checked as a full system, not just switched on.
Plan the installationROOM / SITEVIEW / CONTENTACCESS / TIMING
LED-wall testing and calibration check the screen, inputs, picture, and handover before the job is complete.
Check panel alignment
Test power, data, inputs, and resolution
Check brightness and colour for the proposed display
Show the agreed content and support process
HANDOVER PROTOCOL / INDOORREF CH-01
01
SET UP
Check the display, processor, and inputs.
02
TEST
Check alignment, picture, and content.
03
HAND OVER
Show you how the system works.
Ask about these checks
| Alignment | How will the wall be checked for a flat, clear picture? |
|---|---|
| Calibration | What applies to the proposed display? |
| Content | Which inputs and formats will be tested? |
| Support | What help is included after handover? |
COMMON PROJECT QUESTIONSROOM · VIEW · SCOPE
Measure the space. Check the wall, viewing distance, access, and light.
Choose for the use. Match the display to the audience and content.
Plan the install. Include mounting, power, cables, and testing.
Next step
Tell us about your space.
Tell us where the screen will go and what you want to show. Free site surveys are available across Singapore.
WhatsApp us